Please register or log in.
Mobiles Prices in Pakistan
Item details add to favorites
Category Real Estate
No Picture
Created 20-Jun-2017
Owner posuiji
Title Countermeasures for reducing construction waste
Description Construction waste is generated in the construction, maintenance, management, facilities updates, building demolition and construction waste recycling and other aspects. Therefore, the construction and control of construction waste, from the construction plan, design plan to the construction of demolition and other aspects of the start. The building should have a longer service life, construction waste crusher by using a better design of the building is not easy to damage by using better durability and versatility of the building by building better, so that the building is more durable. The structure design of less produce construction waste, construction waste, there is no change, no material re use of accessories, which requires designers usually the size of the construction process, building materials and building components have accurate understanding, of course, the national standards or industry standards should be early on these dimensions do appearance. Building materials and recycled building materials with less construction waste are selected. For construction units, the construction waste crushing equipment, such as the construction waste will be calculated separately, it will be found that reducing the cost of construction waste in the construction budget is becoming increasingly important. It should be considered that the building will be easy to be repaired and reconstructed in the future, and the construction waste will be less. The regeneration of building materials and components shall be considered in future demolition of buildings. Resolutely put an end to Jerry, lower the quality of the project, this kind of thing has happened at home and abroad. Quality problems can be found before the building collapses, or repairs, reinforcement, or demolition and reconstruction results in more construction waste. On the other hand, arranging the construction schedule scientifically is also an important factor to ensure the quality of the project.
Price  
Promotion level None
Free Group SMS in Pakistan